Yes
The only difference between in-city and out-of-town is that the accommodation and food costs of the assembly team are covered by the customer. (The assembly team is maximum 4 people.)
If the location of the building is in a municipality, a license is required.
Our customer gets the license and legal permits himself. Architectural project, Electrical project, Plumbing project, Mechanical Plan and ground survey belong to the customer to obtain a license. If requested, we only provide static calculations of the building for a fee.
WORK INCLUDED IN OUR PRICE. - In general, we build prefabricated houses on rough delivery. This includes. Installation works of the prefabricated building All kinds of prefabricated building materials (Wall panels, joint elements, ceiling covering, ceiling insulation and roofing material) Exterior and interior doors, windows, transoms and glazing are included. - If requested, for an extra cost, we can also apply mastic to the joint elements of the building and paint the interior and exterior of the building, install the internal electrical installations of the building and install the armatures, install the sanitary installations of the building and install the armatures.
Floor concrete and all kinds of excavation and landscaping works Floor and wall coverings (screed, ceramic, tile, carpet, etc...) , Making external connections outside the prefabricated building (electricity, sewage, clean water), Permits and license works that must be obtained from the municipality, Heating and cooling installations (heating, air conditioning, etc...) Accommodation and food costs of the installation team for installations outside Istanbul, transportation and transportation insurance of the material belong to our customer.
No, it does not reduce it. On the contrary, it provides 10% net space gain compared to a structure with a reinforced concrete carrier system.
Alternative 1: Thickening of external walls, thickening of ceiling insulation
2nd Alternative: Additional coating on the exterior of the building (Sheathing, PVC siding etc...)
3rd Alternative : Replacement of roof covering (Osb+Mebrane+Shingle)
An average 100m2 single storey building is completed between 2 days and 15 days depending on our current production situation and made ready for shipment. After the shipment and the ground concrete is delivered to us, the assembly of the building is completed in 5 days.
As of the contract date, 50% of the total amount including VAT is collected in cash. The remaining balance is collected as a check with 30 and 60 days maturity as of the contract date. Alternative payment plans can be mutually negotiated.
We can build 2 storeys. It can be done with more floors, but the unit m2 cost will increase due to the increase in building construction.
If exterior and interior painting of a building is done in 2 years, it can easily be used for 50 years.
You can see it in the Technical specifications section of our website.
The project you want can be done as long as it fits our standard axle dimensions.
Prefabricated houses are equipped with an insulation system that will allow use in 4 seasons. Buildings can be produced for every climate conditions. Production is carried out taking into account the climatic characteristics of the place where the buildings will be installed.
All applications made in reinforced concrete buildings can also be made in prefabricated buildings.
Since the walls are panel system, this application can be done with screws instead of nails.
As with reinforced concrete buildings, you can paint your prefabricated building yourself very easily.
The static calculations of these buildings are made according to the relevant standards (TS 648, TS 498, TS 11.372 etc.) and regulations. Therefore, there is a permissible amount of deflection on the intermediate floors, but if our customer does not want this at all, comfort conditions can be increased and swaying can be completely eliminated. It is possible by calculation during the project.
Yes, it can be installed. Only dismantling cost, reassembly cost and paint cost are incurred. Renovation is possible in buildings if desired.
Absolutely none. All materials used are produced in accordance with TSE requirements.
Prefabricated houses are produced considering the conditions of the 1st earthquake zone.
You can choose a color of your choice.
Prefabricated buildings are transported by truck, truck, ship, train or cargo planes.
Prefabricated lightweight prefabricated structures are mounted on a pre-prepared concrete floor. Prefabricated buildings are mounted on the concrete floor with anchors or steel dowels. Thus, the building and concrete move together.